Fredrick H. Zal | Atelier Z; an.architecture and industrial design studio, advocating dialogue in the fine + applied arts © ALL WORKS PROPERTY OF ATELIER Z or COLLABORATORS. DO NOT COPY, LINK OR DOWNLOAD.
Philadelphia
Portland
ARCHITECTURE | FURNITURE | ART | CONTACT

 


ARCHITECTURE

 

Community

Design Competitions

Event Production
Urban Design + Master Planning
Institutional

 

Residential

Multi-Family + Mixed-Use

New Single-Family Homes

Adaptive Re-Use, Remodels, + Additions

 

Commercial

Retail

Restaurants

Entertainment

Office

 


FURNITURE

Cabinetry

Installations

Table, Lamp + Chair

 


ART

 

Applied Art

Industrial Design

Identity Packages + Graphic Design
Web Design

 

Performance Art

Dance
Modeling


Fine Art

Sculptural Installations
Photography

 


ABOUT ATELIER Z

 

Studio Culture

People

Rate of Pay

Employment Opportunities

Collaborators

Inspiration

Philosophy

 

Advocacy

Creative Advising
Teaching
Gallery + Art Patronage

 

Theory + Research

Empathy

Morphology

Material Narrative

Pre-Fabrication + Mass Customization
Design Language for Students + Patrons

Gestalt Psychology

 

Press

Publications + Video
Public Engagements


Search Site
CONTACT + e-Mail


Save Mother Earth Office of Sustainable Development, Portland, Oregon: BlueWorks Business Award for Environmental Sustainability
1% For The Planet Sierra Club Advocate
Reduce Recycle Rethink preFabrication - Modular Building
Architecture 2030
Blue Sky Renewable Energy

Bookmark and Share

Atelier Z on Facebook

12 + BURNSIDE

TOWER


B12.TOWER.1999

Springing up from a sloping plinth massed within the chaos of three intense commuter boulevards on the East side of Portland's downtown core, the fourteen story tower of residences over retail and office instills order, beauty and fire to a lost neighborhood. 

B12.TOWER.1999
The Portland Development Commission has long been searching for an appropriate 'Gateway' project to help identify the area, and provide a beacon in the jungle of urban decay and debauchery.  

B12.TOWER.1999

Unfortunately, the project was thrown-out by the design review jury as 'sculpture' and not deemed appropriate as 'architecture'. 

Pity!

Max Height 50'
In developing this critical juncture in the Central City Plan District, the City should augment the parameters of this site in the context of it being a 'Gateway' site. The City should not only evaluate the peak height of this building, but they should also fluidly evaluate the percentage of built area with that allowed height. Hence the purpose for that little 'd' after EX[d]! This area is currently only allocated a 50' height, but the neighboring areas are allowed 100' - 200' respectively. The form, which is show here, is only 150' in height, which is quite appropriate for the 'Gateway' to those taller zoned areas. This property, and the one kitty-corner to it [4 Square Church's parking lot], will hopefully become structures with a grand urban scale.
B12.TOWER.1999
Synergy - Form
The level of kinetic and cerebral energy blowing through this site is incredible. Pumped twenty-four hours a day, this site demands to have an identifying form, which spring forth from that around it. The culture, which teems within this area is desperate for identity. They do not want to have trash laden vacant land. The writing is on the walls, literally! Give them something to identify with, give them an icon to navigate their life by, give them a home.
B12.TOWER.1999
Sanctuary
Amidst the sound and the fury of this congested chaos, it will be rewarding to come home + arrive at a place of solace, a place to worship the fleeting rays of the Portland sun. Due to the amount of noise generated from the surrounding street traffic and adult entertainment industries, creating both a physical and mental buffer will be critical to the success of any project developed on this site.
B12.TOWER.1999
Max FAR 3:1
Even through Floor Area Ration [FAR] does not apply to residential development, this intersection could be the site of many new businesses in the proposed office block. Since the adjoining area is zoned with a 9:1 FAR, it would be quite appropriate to attain a variance to allow for the six levels of offices, two levels of structured parking, and the sun court [approx. 6:1 FAR] needed to maximize the potential of this site. It is also expected that the roof gardens will be in the best interest of the residents and the City.



PROJECT STATISTICS:
PROJECT: 12th + Burnside Tower, 1999.
COST: $tbd
LOCATION: Intersection of 12th, Burnside, and Sandy Boulevard, Portland, Oregon
CLIENT: City of Portland

 


inspiration:
CoopHimmelblau.Hamburg.1985
Coop Himmelb[l]au, Wolf D. Prix + Helmut Swiczinsky, "Skyline" Project, Hamburg, Germany, 1985.